Show simple item record

dc.contributor.authorSeck Tuoh Mora, Juan Carlosen_US
dc.date.accessioned2013-11-04T22:00:43Z
dc.date.available2013-11-04T22:00:43Z
dc.date.issued2011en_US
dc.identifier.citationMora, E.G. Pérez, G. Seck Tuoh, J.C. Medina, J.es
dc.identifier.urihttps://repository.uaeh.edu.mx/bitstream/handle/123456789/7999
dc.description.abstractIn this document we develop a non-linear, stochastic and integer model for the problem of determining the optimal hourly schedule of power generation in a hydrothermal power system. e consider a power generation system comprising thermal and hydro units and the problem concerns the scheduling of operation levels for all power units and considering the hydro constrains, such that the operation costs over the time horizon are minimal. The level of customer service equation is introduced and the power balance constraint, total water discharge constraint, reservoir volume limits and constraints on the operation limits of the hydrothermal generator and the thermal generator are fully accounted for. The proposed problem is illustrated and tested on two model systems using a random search technique and genetic algorithm. We report the practical and theoretical results.es
dc.languageesen_US
dc.subjectAutomatización y Optimización de Sistemas Industriales Autómatas Celulareses
dc.titleOBTAINING THE OPTIMAL SHORT-TERM HYDROTHERMAL COORDINATION SCHEDULING: A STOCHASTIC VIEW POINTes
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record