Search
Now showing items 181-190 of 1911
Qué es Proyecto
(2011-07)
Project
•Project is the set of records to estimate the economic advantages and disadvantages of the allocation of inputs to the production of goods and services.
•A project is a planned undertaking consisting of a set ...
Recorrido de Árboles Binarios
(2011-07)
This presentation shows to us as the different types from route are realised on a Binary tree structure.
Electrochemical study of the pitting reproducibility
(2014)
Knowledge of the Corrosion processes is of high importance as they can be used to improve production of alternative energy such as in the hydrogen cells. Nowadays, research on the energy conversion is increasing because ...
CAN
(2016-01-31)
We are going to use the verb can for abilities and permission.
APPLYING AN ADAPTIVE PETRI NET TO CALCULATE THE MAKESPAN IN THE JOB SHOP SCHEDULING PROBLEM
(2014)
The Job Shop Scheduling Problem (JSSP) is one of the
typical problems that engineers face on designing
Flexible Manufacturing Systems (FMS). In this
problem, it is important to find the optimal scheduling
to perform a set ...
Programación lineal
(2015-06-30)
-
Simulación
(2015-06-30)
-
Efecto de la cráneo-electroacupuntura sobre estrés oxidativo en un modelo de desnutrición crónica
(2015)
La acupuntura es una modalidad terapéutica de la
Medicina Tradicional China, la cual ha sido practicada
por miles de años. En la actualidad es avalada por la
Organización Mundial de la Salud para el tratamiento de
diversas ...
Método de Iteración directa
(2017-01-31)
El método de la iteración directa no necesita un intervalo [a, b], solo un punto, requiere que la función f(x) sea continua en el intervalo [a, b]. No es muy confiables ya que no siempre converge, requiere acomodar al ...